Estadísticas
Número total de visitas
Visitas | |
---|---|
System Level Optimization of 5 MW Wind Converter using 3L-NPC Topology in Medium Voltage with 1 . 7 kV IGBT | 288 |
Visitas al mes
diciembre 2022 | |
---|---|
System Level Optimization of 5 MW Wind Converter using 3L-NPC Topology in Medium Voltage with 1 . 7 kV IGBT | 29 |
enero 2023 | febrero 2023 | marzo 2023 | abril 2023 | mayo 2023 | junio 2023 | |
---|---|---|---|---|---|---|
System Level Optimization of 5 MW Wind Converter using 3L-NPC Topology in Medium Voltage with 1 . 7 kV IGBT | 10 | 9 | 12 | 2 | 1 | 4 |
julio 2023 | agosto 2023 | |
---|---|---|
System Level Optimization of 5 MW Wind Converter using 3L-NPC Topology in Medium Voltage with 1 . 7 kV IGBT | 10 | 4 |
enero 2024 | febrero 2024 | marzo 2024 | abril 2024 | mayo 2024 | junio 2024 | |
---|---|---|---|---|---|---|
System Level Optimization of 5 MW Wind Converter using 3L-NPC Topology in Medium Voltage with 1 . 7 kV IGBT | 9 | 9 | 2 | 23 | 6 | 20 |
julio 2024 | agosto 2024 | septiembre 2024 | octubre 2024 | noviembre 2024 | |
---|---|---|---|---|---|
System Level Optimization of 5 MW Wind Converter using 3L-NPC Topology in Medium Voltage with 1 . 7 kV IGBT | 15 | 25 | 69 | 13 | 16 |
Descargas del fichero
Visitas | |
---|---|
System Level Optimization of 5 MW Wind Converter using 3L-NPC Topology in Medium Voltage with 1.7.pdf | 75 |
Países con más visitas
Visitas | |
---|---|
Estados Unidos | 125 |
España | 57 |
Japón | 35 |
China | 23 |
Bélgica | 19 |
Australia | 10 |
Singapur | 4 |
Alemania | 3 |
Ucrania | 2 |
Argentina | 1 |
Ciudades con más visitas
Visitas | |
---|---|
Vitoria-Gasteiz | 53 |
Boardman | 18 |
Shanghai | 12 |
Ashburn | 7 |
Absecon | 5 |
Brisbane | 4 |
Perth | 3 |
Odesa | 2 |
Auckland | 1 |
Barcelona | 1 |