Erregistro soila

Gestión del búfer de capacidad en la aplicación de la metodología drum-buffer-rope en entornos de fabricación contra pedido

dc.contributor.authorORUE, AITOR
dc.contributor.authorLizarralde, Aitor
dc.contributor.authorApaolaza, Unai
dc.contributor.otherGarcia, Alvaro
dc.date.accessioned2024-03-07T13:49:10Z
dc.date.available2024-03-07T13:49:10Z
dc.date.issued2022
dc.identifier.issn1989-1490en
dc.identifier.otherhttps://katalogoa.mondragon.edu/janium-bin/janium_login_opac.pl?find&ficha_no=171344en
dc.identifier.urihttps://hdl.handle.net/20.500.11984/6278
dc.description.abstractThe research work conducted by Orue et al. [1] aims to analyze the impact of protective capacity on the application of the third step of the drum-buffer-rope methodology of the theory of constraints (subordinate everything to the bottleneck) in make-to-order environments. To analyze the impact of protective capacity, a discrete event simulation is performed. Experimental results suggest that, at different levels of variability, different levels of protective capacity are needed to keep the system stable. The higher the variability, the higher the level of protection needed. It can be concluded that the definition of the level of protective capacity required is a strategic decision for the organization. For managers to know and control how much protection is necessary and how much is overcapacity or waste, monitoring and managing the use of protective capacity is paramount. This concept of protection monitoring and control is relatively new in the theory of constraints methodology, but it is applied in the demand-driven adaptive enterprise model [2]. Therefore, it is advisable to manage capacity buffers as is done in the methodology.en
dc.language.isoengen
dc.publisherFederación de Asociaciones de Ingenieros Industriales de Españaen
dc.rights© 2022 The Authorsen
dc.subjecttheory of constraints (TOC)en
dc.subjectdrum-buffer-ropeen
dc.subjectprotective capacityen
dc.subjectmake-to-orderen
dc.subjectcapacity bufferen
dc.subjectteoría de las restriccioneses
dc.subjectcapacidad de protecciónes
dc.subjectfabricación contra pedidoes
dc.subjectbuffer de capacidades
dc.titleCapacity buffer management in implementing drum-buffer-rope methodology in make-to-order environmentsen
dc.titleGestión del búfer de capacidad en la aplicación de la metodología drum-buffer-rope en entornos de fabricación contra pedido
dcterms.accessRightshttp://purl.org/coar/access_right/c_f1cfen
dcterms.sourceDYNAen
local.contributor.groupDirección de operaciones logístico productivases
local.description.peerreviewedtrueen
local.identifier.doihttps://doi.org/10.6036/10764en
local.embargo.enddate2029-01-31
local.contributor.otherinstitutionhttps://ror.org/03n6nwv02en
oaire.format.mimetypeapplication/pdfen
oaire.file$DSPACE\assetstoreen
oaire.resourceTypehttp://purl.org/coar/resource_type/c_6501en
oaire.versionhttp://purl.org/coar/version/c_970fb48d4fbd8a85en
dc.unesco.campohttp://skos.um.es/unesco6/33en
dc.unesco.disciplinahttp://skos.um.es/unesco6/3310en


Item honetako fitxategiak

Thumbnail

Item hau honako bilduma honetan/hauetan agertzen da

Erregistro soila