A Strategic Approach for Bottleneck Identification in Make-To-Order Environments: A Drum-Buffer-Rope Action Research Based Case Study
(OmniaScience, 2020)
Purpose: This study focused on providing a strategic perspective for the selection and exploitation of bottlenecks in make-to-order production systems, a largely unexplored field in the literature. The researchers developed ...
Managing Multiple Projects in Uncertain Contexts: A Case Study on the Application of a New Approach Based on the Critical Chain Method
(MDPI AG, 2020)
Uncertainty and change are two features of modern project management. They strongly influence the project management needs to operate in such contexts. This is the case when a complete and accurate definition of the scope ...
Theory of constraints case study in the make to order environment
(Omnia Science, 2021)
Purpose: The theory of constraints (TOC) drum-buffer-rope methodology is appropriate when managing a production plant in complex environments, such as make-to-order (MTO) scenarios. However, some difficulties have been ...
Modern Project Management Approaches in Uncertainty Environments: A Comparative Study Based on Action Research
(MDPI, 2020)
Change and high uncertainty levels are the main characteristics of current project contexts. Years ago, the traditional project management faced problems when operating in these environments. Thus, at the end of the 20th ...
Demand Driven MRP – The need to standardise an implementation process
(Universitat Politècnica de València, 2020)
Since the creation of the demand-driven material requirement planning (DDMRP) model, numerous studies have analysed the methodology’s significant impact on different organisations. Several successful cases and research ...
The impact of protective capacity in implementing drum-buffer-rope methodology in make-to-order environments: an assessment by simulationEl impacto de la capacidad de protección en la aplicación de la metodología “drum-buffer-rope” en entornos de fabricación “make-to-order”
(Publicaciones DYNA, 2022)
This study uses simulation to analyse the impact of protective capacity in the implementation of the step 3 of the theory of constraints (TOC) methodology in make-to-order (MTO) environments. The results suggest that at ...
Capacity buffer management in implementing drum-buffer-rope methodology in make-to-order environmentsGestión del búfer de capacidad en la aplicación de la metodología drum-buffer-rope en entornos de fabricación contra pedido
(Federación de Asociaciones de Ingenieros Industriales de España, 2022)
The research work conducted by Orue et al. [1] aims to analyze the impact of protective capacity on the application of the third step of the drum-buffer-rope methodology of the theory of constraints (subordinate everything ...