Izenburua
Material management without forecasting: From MRP to demand driven MRPBertsioa
Bertsio argitaratua
Sarbidea
Sarbide irekiaArgitaratzailearen bertsioa
http://dx.doi.org/10.3926/jiem.2654Non argitaratua
Journal of Industrial Engineering and Management Vol.11. Nº 4. Pp. 632-650. OmniaScience, 2018Lehenengo orria
632Azken orria
650Argitaratzailea
OmniaScienceGako-hitzak
DDMRP
inventory level
visibility
MRP ... [+]
inventory level
visibility
MRP ... [+]
DDMRP
inventory level
visibility
MRP
forecast
uncertainty [-]
inventory level
visibility
MRP
forecast
uncertainty [-]
Laburpena
Purpose: Efficient Operations and Supply Chain Management is key to building sustainable competitive edge for companies. However, the achievement of this goal is becoming challenging in the present dy ... [+]
Purpose: Efficient Operations and Supply Chain Management is key to building sustainable competitive edge for companies. However, the achievement of this goal is becoming challenging in the present dynamic production environment, as traditional Manufacturing Planning and Control systems were not developed to work in this context. The Demand-Driven Material Requirement Planning (DDMRP) methodology was developed with the aim of addressing this need and deal efficiently with material management. The present work therefore, analyzes the implemented changes and the subsequent qualitative and quantitative results of a company after converting from MRP to DDMRP.
Design/methodology/approach: To achieve an in depth understanding of the case study a qualitative approach was taken. Data was collected from semi-structured interviews, documents and archival records enabling triangulation. The results from before and after the implementation of DDMRP were compared, and the evolution of the performance of the company was evaluated.
Findings: The results clearly show that using DDMRP the company increased visibility in the supply chain. In addition, the inventory level was reduced by 52.53% while material consumption was increased by 8.7%. These results were achieved while maintaining the high service level.
Originality/value: DDMRP is a relatively new methodology and for this reason there is little published data in this field. In addition the few studies found in the literature analyze the performance of DDMRP in simulated environments. The present work aims to go one step further and analyzes the implementation of DDMRP in a real company. [-]
Bildumak
Item honek honako baimen-fitxategi hauek dauzka asoziatuta: