Izenburua
Holistic lean planning for flexibility in volatile markets: Design and validation of a model for the transformation of manufacturing plantsArgitalpen data
2025Bertsioa
Bertsio argitaratuaDokumentu-mota
Datu-multzoaHizkuntza
GaztelaniaEskubideak
© Mondragon Goi Eskola PoliteknikoaSarbidea
Sarbide irekiaArgitaratzailearen bertsioa
https://doi.org/10.48764/4XHW-2737Argitaratzailea
Mondragon Unibertsitatea. Goi Eskola PoliteknikoaDeskribapena
Description of methods used for collection/generation of data:
The data from the file 2012_06_14 were collected by the authors on the shop floor using the method they proposed, called Multimoment. (Navarro et al., 2023).
Methods for processing the data: (Navarro et al., 2023)


















